0
DC Projects
0
Operational
0
Under Construction
0
Announced
2
IM3 Facilities
12
Network Nodes
—
Planned Gen (MW)
DC Projects
(0)OSM · Wikidata · NewsNo projects indexed for this market yet.
Network & Colocation
(12)PeeringDBSwitch Las Vegas
Switch, Ltd.
46 networks1 IXPs
Fiberhub LAS1
Fiberhub
15 networks
DataBank Las Vegas (LAS1)
DataBank, Ltd.
11 networks1 IXPs
EdgeConneX Las Vegas (EDCLAS01)
EdgeConneX Inc.
14 networks1 IXPs
Flexential - Las Vegas/Downtown (LAS03)
Flexential Corp.
6 networks
Flexential - Las Vegas/Downtown (LAS05)
Flexential Corp.
2 networks
Flexential - Las Vegas/North (LAS04)
Flexential Corp.
11 networks1 IXPs
Roller Network (Reno, NV)
Roller Network LLC
6 networks1 IXPs
Switch Tahoe Reno
Switch, Ltd.
7 networks
200 South Virginia - Reno
Basin Street Properties - Tahoe - Reno
5 networks1 IXPs
CENTRA RNO01 - Reno Nevada (200 S. Virginia)
CENTRA Digital Interconnect
4 networks
EdgeCore Reno 1
EdgeCore Digital Infrastructure
0 networks
Grid & Power
ISO / RTOWECC
Full NameWestern Electricity Coordinating Council
Power LayerEIA data pending
IM3 Verified Facilities (2)
Switch Tahoe Reno - The Citadel Campus
Switch
Fiberhub LAS1
Fiberhub
Building in Nevada?
We source the network into facilities in this market — laterals, waves, transit, and cross-connects — across 100+ suppliers, at no cost to you.
Start a Sourcing Request →Connectivity Procurement
Getting fiber to a site in Nevada.
Reno is a 2026 deal-activity leader on the strength of the Tahoe Reno Industrial Center and its proximity to Northern California power and fiber routes, but it sits outside the traditional dark-fiber core of Northern Virginia, Silicon Valley, Chicago, and Dallas. Expect a thinner regional carrier bench than legacy hubs and plan laterals early — fiber cable lead times of 20 weeks to a year make route planning a schedule-critical task, not an afterthought.
20 wks – 1 yr
Fiber cable lead times, mid-2026
$18 vs $8 /ft
Underground vs aerial construction medians (FBA 2025)
100+
Suppliers quoted, national + regional