DEVELOPING MARKETBCH · Canada

British Columbia
CONSTRAINED, BUT SITE C IS FRESH MW

BC limits new DC interconnections in 2026 to 300 MW for AI and 100 MW general — but Site C just came online and First Nations partnerships are unlocking the bulk of viable opportunities.

0
DC Projects
0
Operational
0
Under Construction
0
Announced
0
IM3 Facilities
17
Network Nodes
Planned Gen (MW)

DC Projects

(0)OSM · Wikidata · News
No projects indexed for this market yet.

Network & Colocation

(17)PeeringDB
Harbour Centre Vancouver
Polaris Realty
62 networks4 IXPs
Cologix VAN1
Cologix, Inc.
26 networks1 IXPs
Cologix VAN2
Cologix, Inc.
39 networks1 IXPs
Tech Futures YVR1
Tech Futures Interactive Inc.
11 networks4 IXPs
Cologix VAN3
Cologix, Inc.
29 networks3 IXPs
eStruxture VAN-1
eStruxture Data Centers Inc.
6 networks2 IXPs
eStruxture VAN-2
eStruxture Data Centers Inc.
15 networks3 IXPs
Equinix VA1 - Vancouver
Equinix, Inc.
2 networks
Equinix KA1 - Kamloops
Equinix, Inc.
1 networks
eStruxture VAN-3
eStruxture Data Centers Inc.
1 networks2 IXPs
Carrier Connect Harbour Centre
Carrier Connect Systems Ltd.
5 networks1 IXPs
Carrier Connect Waterfront
Carrier Connect Systems Ltd.
5 networks1 IXPs
Cologix VAN4
Cologix, Inc.
2 networks1 IXPs
Cologix VAN5
Cologix, Inc.
2 networks1 IXPs
Hut 8 KEL1
Hut 8 HPC
0 networks
Cube Global
Cube Global Storage
1 networks
Provision Data LM4DC2
Provision Data Systems Inc.
0 networks
Grid & Power
ISO / RTOBCH
Full NameBC Hydro
Power LayerEIA data pending
Building in British Columbia?

We source the network into facilities in this market — laterals, waves, transit, and cross-connects — across 100+ suppliers, at no cost to you.

Start a Sourcing Request →

Connectivity Procurement

Getting fiber to a site in British Columbia.

With new DC interconnections capped in 2026, BC's connectivity story is tightly coupled to where the limited available capacity actually lands — largely through First Nations partnership sites unlocked alongside Site C. Regional fiber options should be evaluated site-by-site rather than assumed at a provincial level, since the constrained interconnection landscape means viable locations are the exception, not the rule.

20 wks – 1 yr
Fiber cable lead times, mid-2026
$18 vs $8 /ft
Underground vs aerial construction medians (FBA 2025)
100+
Suppliers quoted, national + regional
Estimate a lateral in this market →Data Center Connectivity →Book 15 minutes →