0
DC Projects
0
Operational
0
Under Construction
0
Announced
0
IM3 Facilities
18
Network Nodes
—
Planned Gen (MW)
DC Projects
(0)OSM · Wikidata · NewsNo projects indexed for this market yet.
Network & Colocation
(18)PeeringDBHanover Building Calgary
N/A
1 networks
Associated Engineering Plaza (10909 Jasper Avenue)
Colliers International
1 networks
ThinkTel Communications Edmonton
ThinkTel Communications Ltd.
0 networks
Datahive
Datahive
25 networks1 IXPs
University of Calgary
University of Calgary
1 networks
Rogers Calgary DC2 (1313 10th Ave SW)
Rogers Data Centres Inc.
6 networks1 IXPs
Rogers Calgary DC1 (Franklin Atrium)
Rogers Data Centres Inc.
2 networks
Wolfpaw Edmonton 1
Wolfpaw Data Centres
6 networks1 IXPs
O-NET ABOL1 CO
O-NET
1 networks
City of Calgary - City Hall
The City of Calgary
4 networks1 IXPs
Equinix CL3 - Calgary (formerly Q9 Calgary Three)
Equinix, Inc.
13 networks1 IXPs
Arrow Calgary DC1
Arrow Group Inc
12 networks1 IXPs
Rogers Calgary DC3 (Airdrie)
Rogers Data Centres Inc.
1 networks
Arrow Calgary DC2
Arrow Group Inc
30 networks3 IXPs
Equinix CL1 - Calgary
Equinix, Inc.
4 networks1 IXPs
Equinix CL2 - Calgary
Equinix, Inc.
0 networks
Whipcord LDC01
Whipcord Edge Data Centers Inc.
0 networks
eStruxture CAL-2
eStruxture Data Centers Inc.
2 networks
Grid & Power
ISO / RTOAESO
Full NameAlberta Electric System Operator
Power LayerEIA data pending
Building in Alberta?
We source the network into facilities in this market — laterals, waves, transit, and cross-connects — across 100+ suppliers, at no cost to you.
Start a Sourcing Request →Connectivity Procurement
Getting fiber to a site in Alberta.
Alberta is the frontier of Canadian AI data-center development, with Calgary as the gravity center and the Wonder Valley project signaling the scale of what's coming. Fiber infrastructure is still catching up to the 30+ AI DC projects in the AESO interconnection queue — this is a market where connectivity should be scoped alongside power and land from day one, not treated as a later-stage checklist item, given how far ahead of regional fiber build-out the project queue currently runs.
20 wks – 1 yr
Fiber cable lead times, mid-2026
$18 vs $8 /ft
Underground vs aerial construction medians (FBA 2025)
100+
Suppliers quoted, national + regional